We met at Hinksey Heights golf course and nature trail on a fine sunny morning. We parked before the main car park, as most of us were working in a different area than usual. 
We were by a field of lovely Dexter cattle and had a wonderful view of Oxford.

Dexter with calf
The Dexter cattle with a view of Oxford 

John Brimble, the landowner met us and explained the tasks. 
The briefing
One task, only needing a few people, was to scythe and rake the wildflower patch at the start of the nature trail and Sally, Jim and Dieuwke went off to do this
Jim scything the wild flower patch near the pond
Dieuwke dragging the cut vegetation to the heap, which will be a good habitat pile for invertebrates over winter
The heap
The finished area - Jim and Sally also scythed along the fenceline and then formed a barrier to prevent waifs and strays from venturing onto the field.  The heap will also be good habitat for invertebrates

For the rest of us, the main task was to coppice hazel trees along the hedge at the edge of the golf course and to use the cut branches to make a barrier between the Chiswell valley footpath and the golf course. 
We piled our tools on to the trailer and John drove the tractor up to where we were going to be working. The hazels to be coppiced were all marked with tape. The branches were to be cut off close to the trunk with a diagonal cut sloping downwards away from the trunk. This would cause the rain to run down away from the trunk. We dragged the cut branches over to the boundary and cut them, if necessary, into suitable sections for the barrier.
Carolyn and Roger coppicing
 Philip beside his coppiced hazel. It shows the coppicing quite clearly, with the diagonal cut sloping down away from the trunk.
Making the barrier (Kevin, I think)
Lesley sawing up the larger branches
The barrier
Jelly Ear fungus (Auricularia auricula-judae) growing on the dead Elderberry which we cut down

By break time, all the marked hazels had been coppiced. For the second part of the morning, we went further up the field, avoiding the badger sett, in order to cut back bramble and blackthorn along the edge of the field and drag it to the boundary. 
A welcome tea break

As 12.30 approached, it was time to finish cutting and clear up. We piled the tools on to the trailer and headed back down the field.

Comments

Popular posts from this blog

Jarn Mound and Wild Garden, Boars Hill, 9th April 2016

Lincombe Lane Field, Boars Hill - Saturday, 2 May 2026

Lincombe Lane Field, Boars Hill - Saturday, 24th January 2026